WBS33AY00PFN54332

2023 BMW M3 COMPETI

Лот: 86850155
Дата торгов: 2025-11-28
Локация: TX - HOUSTON
Страна:
Двигатель: 3.0L 6
КПП:
Топливо:
Привод: Rear-wheel drive
Пробег: 22981 miles
Цвет:
Ключи:
Повреждение: WATER/FLOOD
Доп. повреждение:
WBS33AY00PFN54332

Описание лота

2023 BMW M3 COMPETI — VIN: WBS33AY00PFN54332. This vehicle is listed on the Copart insurance auction in TX - HOUSTON. This page is helpful if you plan to buy a car from the USA or explore the VIN history of the lot.

BMW M3 COMPETI 2023 comes with 3.0L 6, n/a transmission and Rear-wheel drive drivetrain. The sale was scheduled at TX - HOUSTON on 2025-11-28. Primary damage: WATER/FLOOD.

If you consider buying a BMW M3 COMPETI at Copart, visit all BMW listings to compare prices, mileage and condition. All data comes from public auction sources, so you get the real VIN-based vehicle history.

VIN WBS33AY00PFN54332 can be used for a Carfax report to check owners and insurance incidents. This detail page is updated automatically when new auction data appears.

Buying from the US can save up to 40%. Track fresh lots on the SomeCars home page — we add new vehicles every day.

Технические характеристики

Год выпуска 2023
Двигатель 3.0L 6
КПП
Привод Rear-wheel drive
Пробег 22981 miles
Локация аукциона TX - HOUSTON
Лот 86850155

Состояние и повреждения

  • Основное повреждение: WATER/FLOOD
  • Доп. повреждение: —
  • Наличие ключей: —

Similar lots

Другие BMW

Latest VINs